Location:
Gladstone, QLD
Client:
Pipeline Drillers Group
Pipe Specs:
710mm HDPE
Max Length:
170m
Geology:
Clay, Gravel
HDD Crossing:
Water Crossing
Future-Proof Solutions participated in another trenchless project in Gladstone, QLD, for an emergency pipeline replacement under Auckland Creek. FPS provided full for-construction HDD design suites for the 170m, 710mm PN20 HDPE pipeline. This was inclusive of a thorough construction evaluation, HDD profile and alignment, hydrofracture analysis, entry/exit site layouts, and stringing/welding/vehicle access areas. The urgent nature of these works required close collaboration with stakeholders and extremely fast turnarounds for all construction documents.