Future-Proof Solutions is proud to announce the addition of a brand new product to our core trenchless design range: the drilling fluid plan.
Developed by our Design Engineer, our new drilling fluid plans set out the key aspects required to effectively plan and assess drilling fluid requirements at the earliest possible stage of the HDD project. Taking into account project variables and assumptions including planned drilling passes, pumping rates and more, we fully tailor our drilling fluid plans to optimise fluid, operations, and borehole performance to the project. Backed up by sound engineering principles and our years of experience managing drilling fluid on HDD projects, our clients are equipped from the design stage to cost-effectively plan drilling fluid products and procurement, implement the plan, and efficiently control drilling fluid on their trenchless project, to maximum benefit.
Our Director, Colin Harris, stated that the value of planning this vital aspect of HDD projects could not be understated. “Everyone in the trenchless industry knows that traditionally, drilling fluid can be unpredictable. But by starting with a well-planned baseline for use, optimisation, and disposal of drilling fluids, projects can really cut down on the unknowns, mitigating their risks and exposure to delays and extra cost,” Col said.
Read more about the inclusions of our drilling fluid plans and the benefits that one could bring to your next HDD project here. We’re also happy to tailor the inclusions in the plan to suit our clients’ individual needs. Just get in touch, and we’ll be happy to help.