Location:
Vadu, Romania
Client:
Revicond HDD
Pipe Specs:
406mm Steel
Max Length:
1,514m
Geology:
Alluvials, Rock
HDD Crossing:
Outfall (Shore Approach)
Future-Proof Solutions was proud to provide trenchless engineering services to support a major international infrastructure development project: the Midia Gas Development Project. Marking Romania’s first HDD ocean outfall, horizontal directional drilling was used to install a 1514m, 406mm steel pipeline in the Black Sea, as part of the larger 144km gas field and treatment plant connection project. Our HDD design specialists completed detailed installation and integrity calculations, hydrofracture analysis, and a project-specific drill pipe bending and lifting analysis, which was thoroughly scrutinised and validated by Lloyds of London.