Location:
Walloon, QLD

Client:
Pipeline Drillers Group

Pipe Specs:
180mm & 315mm HDPE

Max Length:
165m

Geology:
Rock

HDD Crossing:
Creek Crossing

Future-Proof Solutions were engaged by Pipeline Drillers Group to provide full for-construction design for the drilling and installation of 180mm x 315mm HDPE sewer and gravity main pipelines of lengths 160m and 165m. FPS completed full design suites, including HDD profiles and alignments, fracture gradients, and full construction evaluation, providing for successful and speedy pipeline installations in challenging environmental conditions.